Level:
Correct: 0
Incorrect: 0
Marks: 0/0
Exam Practice
Course:
Topics:
AQA GCSE Design and Technology Smart practice A mixed round aimed at your weak spots
Unit 1
Core technical principles
Unit 2
Specialist technical principles
Unit 3
Designing and making principles
Investigation, primary and secondary data
Investigation, primary and secondary data
Environmental, social and economic challenge
Environmental, social and economic challenge
Design strategies
Design strategies
Communication of design ideas
Communication of design ideas
Prototype development
Prototype development
Selection of materials and components
Selecting materials and components for prototypes
Specialist tools and equipment
Specialist tools and equipment
Avg
score:
–
Topics
done:
0/40

Scales of production

Practise 18 exam-style questions on Scales of production for AQA GCSE Design and Technology. Write your answer as you would in the exam and get it marked in seconds against the mark scheme, point by point, with the Study Helper on hand if you get stuck.

  • 18 questions
  • 1–8 marks each
  • Instant marking
  • No sign-up needed
18 questions, marked as you go

Sample questions with model answers

Here are 4 of the questions in this topic, each with a model answer, an explanation of why it earns the marks and the mark scheme an examiner would use.

Question 1

2 marks

Give two examples of products or materials that are made by continuous production.

Model answer

1. Paper, made on reels in a paper mill.
2. Steel, made in a steelworks.

Explanation

Continuous production suits materials and simple standard products that are needed in vast, steady quantities and whose processes are costly to stop, such as papermaking, steel making, glass making and polymer extrusion. Products such as cars and phones are mass produced, not continuously produced.

Mark scheme
  1. 1 mark

    A valid example, e.g. paper or board on reels / steel (sheet, coil or bar) / float (sheet) glass / polymer granules, film, pipe or other extruded sections

    One mark for each correct example, max 2. Do not credit products that are mass or batch produced, such as cars, phones, televisions, furniture or clothing.

  2. 1 mark

    A second, different example, e.g. wire or cable / synthetic fibres or yarn / refined oil products such as petrol / standard components made non-stop in huge numbers, such as screws, nails, zips or resistors

    Do not credit two answers that are the same material (e.g. 'paper' and 'newspaper paper'). Accept all other valid responses.

Question 2

3 marks

Explain why injection moulding is suitable for the mass production of polymer products, but is not usually used to make small batches.

Model answer

The mould tool for injection moulding is machined from steel and can cost tens of thousands of pounds. If 500,000 parts are made, the tool adds only a few pence to each one, but in a batch of 100 it would add hundreds of pounds to each part. Once the tool is made, each cycle takes only seconds and the machine runs automatically, producing identical, accurate parts with very little labour, which suits mass production. For small batches it is cheaper to use a process with a low-cost mould, such as vacuum forming.

Explanation

The scale of production affects which process is chosen. Processes with high tooling costs but fast cycle times, such as injection moulding and press forming, only become economical when the tooling cost is spread over very large numbers. Strong answers explain this spreading of the set-up cost and contrast it with a cheaper process for small batches.

Mark scheme
  1. 1 mark

    The steel (or aluminium) mould tool is very expensive, often thousands or tens of thousands of pounds

    Award 1 mark for each simple point; a point explained in detail (the dependent development) earns 2 marks. max 3. For full marks the answer must address why it suits mass production and why it does not suit small batches. Do not credit a description of how injection moulding works unless it is linked to the scale of production.

  2. 1 mark

    spread over hundreds of thousands of products, the tool cost per item is tiny, but over a small batch it would make each item very expensive

  3. 1 mark

    Each moulding cycle takes only seconds and can be fully automated

  4. 1 mark

    so output is very high and labour cost per item is low

  5. 1 mark

    It produces identical, accurate parts with a good finish, little waste and little finishing needed

  6. 1 mark

    For small batches, processes with cheap moulds or no tooling, such as vacuum forming or 3D printing, are cheaper

    Accept all other valid responses.

Question 3

3 marks

A company laser cuts plywood coasters in batches. Each sheet of plywood gives 24 coasters. Cutting one sheet takes 4 minutes 20 seconds, and unloading it and loading the next sheet takes another 40 seconds.

Calculate the time needed to cut a batch of 1080 coasters. Give your answer in hours and minutes.

Model answer

Number of sheets = 1080 ÷ 24 = 45
Time per sheet = 4 min 20 s + 40 s = 5 minutes
Total time = 45 × 5 = 225 minutes
= 3 hours 45 minutes

Explanation

Work out how many sheets the batch needs, then the full time for each sheet including loading, and multiply. Converting minutes to hours means dividing by 60 and turning the remainder back into minutes: 225 minutes is 3 hours and 45 minutes, not 2.25 or 3.45 hours. Knowing the time for a batch helps a manufacturer plan production and cost each product.

Mark scheme
  1. 1 mark

    Step 1: number of sheets = 1080 ÷ 24 = 45

    Award full marks for a correct answer, even with no working shown.

  2. 1 mark

    Step 2: time = 45 × (4 min 20 s + 40 s) = 45 × 5 = 225 minutes

    ft their number of sheets. If the loading time is left out, 45 × 4 min 20 s = 195 minutes = 3 hours 15 minutes scores Steps 1 and 3 (2 marks).

  3. 1 mark

    Step 3: 225 minutes = 3 hours 45 minutes

    ft their total minutes converted correctly to hours and minutes. Do not accept 3.45 hours or 2.25 hours. Accept 3.75 hours only if '3 hours 45 minutes' is also given.

Question 4

4 marks

Olivia makes oak dining tables to order, each designed for a particular customer. She is thinking of changing to batch production of a standard range of three table designs, made 20 at a time.

Analyse and evaluate this change in terms of the cost of each table.

Model answer

Batch production should make each table cheaper to produce. Olivia could buy oak in bulk at a lower price per cubic metre, and as she would only design three tables, the design time would be shared across every table she makes. She could make jigs, templates or CNC router programs once and reuse them for all 20 tables in a batch, so cutting, jointing and finishing would be much faster and she would set up each machine only once per batch.

However, there are costs on the other side. Jigs, templates or a CNC router would be a large initial cost, and she would have money tied up in oak and in finished tables waiting to be sold, which also need storage space. If one design did not sell, its unsold tables would add to the real cost of the others. Standard tables also cannot be sold at the high price of a bespoke table.

Overall, I think batch production would lower the cost of each table considerably, as long as the range sells well enough to pay back the jigs and stock. She would need to keep her prices high enough to make up for losing the premium of made-to-order work.

Explanation

A Level 2 answer considers both the savings (bulk buying, reused jigs and programs, shared design and set-up time) and the new costs and risks (investment, stock, storage, unsold tables) and reaches a conclusion about the cost of each table. Answers that only list advantages stay in Level 1.

Mark scheme
  1. 4 marks

    Levels of response (4 marks).
    Level 2 (3-4 marks): Well described and justified analysis of how batch production would affect the cost of each table, containing full evaluation and drawing on conclusions having considered both positive and negative factors.
    Level 1 (1-2 marks): Brief points about the cost of each table mentioned but not fully explained. Analysis present but limited evaluation or conclusions drawn. May have focused solely on either positive or negative factors.
    0 marks: No attempt or nothing worthy of credit.

    Indicative content (illustrative, not exhaustive; credit any worthy points made in support of the band descriptors): Analysis: identification of the costs that change. Evaluation: judgement on whether the cost per table would fall overall. Positive: oak can be bought in bulk at a lower price per cubic metre; designs are drawn once, so design time per table falls; jigs, templates and CNC router programs are made once and reused for all 20 tables, so making is faster and needs less skilled time; machines are set up once per batch, spreading the set-up time over 20 tables; parts can be cut and finished together, reducing wasted time; less waste through planned cutting lists and nesting. Negative: buying or making jigs, templates or a CNC router is a large initial cost that must be paid back; money is tied up in stock and finished tables, which need storage space; unsold tables are a risk if a design is unpopular; standard tables cannot command the premium price of bespoke tables, so the income per table may fall even if the cost falls; mistakes in a set-up could spoil several tables. Conclusion: e.g. the cost per table should fall significantly if the range sells well, but Olivia must balance this against the investment, storage and lower selling price. Accept all other valid responses.

Ready to try the rest? Every answer you write is marked against the mark scheme, so you can see exactly where the marks are.

Study Helper Hints first, answers after you try

Stuck on this one? Ask for a hint and I’ll point you in the right direction, without giving the answer away. Once you’ve checked your answer, I’ll show you how the marks are awarded.