Level:
Correct: 0
Incorrect: 0
Marks: 0/0
Exam Practice
Course:
Topics:
Edexcel GCSE Statistics (Higher Paper 2) Smart practice A mixed round aimed at your weak spots
Unit 1
The statistical enquiry cycle
Statistical enquiry cycle stages 1 and 2; (a) Planning: 1a.01, 1a.02, 1a.03
Statistical enquiry cycle: planning and collecting
Statistical enquiry cycle stages 3, 4 and 5
Statistical enquiry cycle: interpreting and evaluating
Unit 2
The collection of data
(b) Types of data: 1b.01, 1b.02, 1b.03
Types of data and variables
(b) Types of data: 1b.04; (d) Collecting data: 1d.01, 1d.02
Primary and secondary data, reliability and validity
(c) Population and sampling: 1c.01, 1c.02, 1c.03
Populations, sampling frames and non-random sampling
(c) Population and sampling: 1c.04, 1c.05
Random and systematic sampling
(c) Population and sampling: 1c.06
Stratified sampling
(d) Collecting data: 1d.05, 1d.06
Problems with collected data and cleaning data
Unit 3
Processing, representing and analysing data
(a) Tabulation, diagrams and representation: 2a.01
Tabulation, tallies, pictograms and two-way tables
(a) Tabulation, diagrams and representation: 2a.01, 2a.02
Pie charts and comparative pie charts
(a) Tabulation, diagrams and representation: 2a.01
Stem and leaf diagrams
(a) Tabulation, diagrams and representation: 2a.02
Population pyramids, choropleth maps and 2D and 3D diagrams
(a) Tabulation, diagrams and representation: 2a.04
Histograms and frequency density
(a) Tabulation, diagrams and representation: 2a.05, 2a.06, 2a.07, 2a.08
Choosing representations and misleading diagrams
(a) Tabulation, diagrams and representation: 2a.09, 2a.10
Skewness
(b) Measures of central tendency: 2b.01, 2b.02, 2b.03
Mode, median and mean
(b) Measures of central tendency: 2b.01
Weighted mean and geometric mean
(c) Measures of dispersion: 2c.01, 2c.06
Standard deviation and standardised scores
(a) Tabulation, diagrams and representation: 2a.03; (c) Measures of dispersion: 2c.02, 2c.03
Box plots and outliers
(b) Measures of central tendency: 2b.03; (c) Measures of dispersion: 2c.04, 2c.05
Comparing distributions
(d) Further summary statistics: 2d.01
Index numbers
(d) Further summary statistics: 2d.02
Rates of change
(e) Scatter diagrams and correlation: 2e.01, 2e.02, 2e.03
Scatter diagrams, correlation and causation
(e) Scatter diagrams and correlation: 2e.04
Lines of best fit and regression lines
(e) Scatter diagrams and correlation: 2e.05, 2e.06, 2e.07, 2e.08
Spearman's rank and product moment correlation coefficients
(f) Time series: 2f.01, 2f.02; (b) 2b.01 mean seasonal variation
Time series, moving averages and seasonal variation
(g) Quality assurance: 2g.01, 2g.02
Quality assurance and control charts
(h) Estimation: 2h.01, 2h.02, 2h.03
Estimation, sample size and capture-recapture
Unit 4
Probability
3. Probability: 3p.01, 3p.02, 3p.03, 3p.04
Probability, expected frequency and risk
3. Probability: 3p.05, 3p.06, 3p.10
Experimental and theoretical probability and bias
3. Probability: 3p.11
Binomial distribution
3. Probability: 3p.12, 3p.13
Normal distribution
Avg
score:
–
Topics
done:
0/40

Probability, expected frequency and risk

Practise 16 exam-style questions on Probability, expected frequency and risk for Edexcel GCSE Statistics (Higher Paper 2). Write your answer as you would in the exam and get it marked in seconds against the mark scheme, point by point, with the Study Helper on hand if you get stuck.

  • 16 questions
  • 1–5 marks each
  • Instant marking
  • No sign-up needed
16 questions, marked as you go

Sample questions with model answers

Here are 4 of the questions in this topic, each with a model answer, an explanation of why it earns the marks and the mark scheme an examiner would use.

Question 1

1 mark

The records of a school office show that the photocopier breaks down on 4.5% of working days.

The office will be open on 180 working days next year.

Work out an estimate for the number of working days next year on which the photocopier will break down.

Model answer

Expected number of days \(= 0.045 \times 180 = 8.1\)

About 8 working days.

Explanation

Expected frequency = probability \(\times\) number of trials, so change 4.5% to 0.045 and multiply by the 180 days. The answer is an estimate, so 8.1 (or about 8) is fine. Multiplying by 4.5 instead of 0.045 gives an impossible 810 days.

Mark scheme
  1. 1 mark

    B1 for 8.1

    From \(0.045 \times 180\). Accept 8 (rounded to a whole number of days). B0 for 810 (from \(4.5 \times 180\)) or 0.025 (from \(4.5 \div 180\)).

Question 2

2 marks

A factory makes LED light bulbs.
The probability that a bulb made at the factory is faulty is 0.016

A shop finds 12 faulty bulbs in a delivery of bulbs from the factory.

Work out an estimate for the number of bulbs in the delivery.

Model answer

Expected number of faulty bulbs \(= 0.016 \times n\), where n is the number of bulbs.
\(0.016n = 12\)
\(n = 12 \div 0.016 = 750\)

About 750 bulbs.

Explanation

Expected frequency = probability \(\times\) number of bulbs, so here the number of bulbs is the expected frequency divided by the probability. Multiplying 12 by 0.016 gives less than one bulb, which should show that the method is wrong.

Mark scheme
  1. 1 mark

    M1 for \(12 \div 0.016\) oe

    e.g. \(0.016 \times n = 12\), or \(\dfrac{1000}{16} \times 12\). \(12 \times 0.016\) (= 0.192) scores M0. Answer-only rule for this question: A correct answer with no working scores M1A1.

  2. 1 mark

    A1 for 750

    cao. A correct answer with no working scores M1A1.

Question 3

3 marks

The cumulative frequency graph shows information about the masses, \(m\) kg, of 160 parcels delivered to a depot one day.

A parcel delivered to the depot on another day is chosen at random.

Use the graph to estimate the probability that this parcel has a mass between 1.5 kg and 4.5 kg.

Cumulative frequency graph on a grid of small squares. The horizontal axis is "Mass (kg)", from 0 to 6, numbered every 1, with 10 small squares between numbered values (each small square is 0.1). The vertical axis is "Cumulative frequency", from 0 to 160, numbered every 20, with 5 small squares between numbered values (each small square is 4). A smooth curve starts at (0, 0) and passes through (1, 12), (2, 42), (3, 88), (4, 126), (5, 148) and (6, 160) (each point is marked with a cross).

Model answer

From the graph:
cumulative frequency at 1.5 kg ≈ 25
cumulative frequency at 4.5 kg ≈ 138
Number of parcels between 1.5 kg and 4.5 kg ≈ 138 − 25 = 113

Estimated probability \(= \dfrac{113}{160}\) ≈ 0.71

Explanation

Read up from 1.5 kg and from 4.5 kg to the curve and across to the cumulative frequency axis; the difference is the number of parcels between the two masses. Dividing by the total of 160 gives a relative frequency, which estimates the probability for a parcel on another day. A common mistake is to divide one reading by 160 instead of the difference.

Mark scheme
  1. 1 mark

    B1 for reading the cumulative frequency at 1.5 kg (accept 22 to 28 inclusive) or at 4.5 kg (accept 135 to 142 inclusive)

    The curve gives about 24.6 at 1.5 kg and about 138.5 at 4.5 kg; 1.5 and 4.5 are on grid lines, and readings within just under one small square (4 parcels) of these are accepted. May be seen in the working as part of the subtraction, e.g. 138 − 25.

  2. 1 mark

    M1 for \(\dfrac{\text{their reading at 4.5} - \text{their reading at 1.5}}{160}\)

    Both readings must be from the curve (or within the ranges above). Dividing a single reading by 160 scores M0.

  3. 1 mark

    A1 for an answer in the range 0.66 to 0.75 inclusive

    oe as a fraction or percentage, e.g. \(\dfrac{113}{160}\) or 70.6%. The range comes from the accepted readings: (135 − 28) ÷ 160 = 0.669 to (142 − 22) ÷ 160 = 0.75. A probability in the range with no working scores B1M1A1. A count (e.g. 113) given as the answer scores B1M0A0. Using straight lines between the plotted points (27 and 137, giving 0.6875) is within the range. Probabilities must be fractions, decimals or percentages: ratio notation (e.g. 7 : 24) or 'out of' wording (e.g. '7 out of 24') scores A0/B0 for this mark (Pearson's general marking guidance).

Question 4

4 marks

A football league has 400 players.
160 of the players are in teams that play their home games on artificial pitches.
The other 240 players are in teams that play their home games on grass pitches.

For last season, the relative risk of an ankle injury for a player in a team with an artificial pitch, compared with a player in a team with a grass pitch, was 2

Last season, 56 of the 400 players had an ankle injury.

Work out the absolute risk of an ankle injury last season for a player in a team with an artificial pitch.

Model answer

Let the absolute risk for a grass-pitch player be p.
Then the absolute risk for an artificial-pitch player is 2p.

Expected number injured: \(160 \times 2p + 240 \times p = 56\)
\(320p + 240p = 56\)
\(560p = 56\)
\(p = 0.1\)

Absolute risk for an artificial-pitch player \(= 2 \times 0.1 = 0.2\)
(Check: 32 artificial-pitch players and 24 grass-pitch players, 56 in total.)

Explanation

Use an unknown for one absolute risk; the relative risk of 2 makes the other risk double it. Multiplying each risk by the number of players in its group gives the number injured, and these must add up to 56. The overall risk \(\dfrac{56}{400}\) mixes the two groups, so doubling it does not give the risk for artificial pitches.

Mark scheme
  1. 1 mark

    M1 for using p for one absolute risk and 2p (or \(\dfrac{p}{2}\)) for the other in an expression for a number of injured players, e.g. \(160 \times 2p\) or \(240 \times p\)

    Ratio method: M1 for the expected injuries in the ratio \(160 \times 2 : 240\) oe (320 : 240 or 4 : 3). Answer-only rule for this question: A correct answer with no working scores full marks.

  2. 1 mark

    M1 for a correct equation, e.g. \(160 \times 2p + 240p = 56\) (560p = 56)

    Or, with p for the artificial-pitch risk, \(160p + 240 \times \dfrac{p}{2} = 56\) (280p = 56). Ratio method: M1 for \(56 \times \dfrac{4}{7}\) or \(56 \times \dfrac{3}{7}\). Trial and improvement that checks a pair of risks in the ratio 2 : 1 against the total of 56 scores M1M1.

  3. 1 mark

    A1 for 0.1 (the absolute risk for a grass-pitch player), or 32 (injured artificial-pitch players), or 24 (injured grass-pitch players)

    A student who solves directly for the artificial-pitch risk (280p = 56, p = 0.2) scores this A1 and the next.

  4. 1 mark

    A1 for 0.2 oe

    e.g. \(\dfrac{32}{160}\), \(\dfrac{1}{5}\) or 20%. A correct answer with no working scores full marks. \(\dfrac{56}{400} \times 2 = 0.28\) scores 0.

Ready to try the rest? Every answer you write is marked against the mark scheme, so you can see exactly where the marks are.

Study Helper Hints first, answers after you try

Stuck on this one? Ask for a hint and I’ll point you in the right direction, without giving the answer away. Once you’ve checked your answer, I’ll show you how the marks are awarded.