Level:
Correct: 0
Incorrect: 0
Marks: 0/0
Exam Practice
Subject:
Topics:
Avg
score:
–
Topics
done:
0/21

Issue: a new reservoir for water supply

Practise 23 exam-style questions on Issue: a new reservoir for water supply for AQA GCSE Geography (Paper 3). Write your answer as you would in the exam and get it marked in seconds against the mark scheme, point by point, with an AI tutor on hand if you get stuck.

  • 23 questions
  • 1–12 marks each
  • Instant marking
  • No sign-up needed
20 questions, marked as you go

Sample questions with model answers

Here are 4 of the questions in this topic, each with a model answer, an explanation of why it earns the marks and the mark scheme an examiner would use.

Question 1

1 mark

Option 3 for meeting the water deficit in south-east England includes building a desalination plant on an estuary.

Which one of the following describes desalination?

A Removing salt from sea water or estuary water to make fresh water
B Recycling waste water from baths and showers to flush toilets
C Storing winter rainfall underground in aquifers
D Pumping water from one river to another

Give the letter of the correct answer.

Model answer

A - removing salt from sea water or estuary water to make fresh water.

Explanation

Desalination plants usually force salty water through very fine membranes (reverse osmosis), which needs a lot of energy. Option B describes grey-water recycling and D describes a water transfer, which are different strategies.

Mark scheme
  1. 1 mark

    A (removing salt from sea water or estuary water to make fresh water)

    Accept the letter or the option written out. Do not accept more than one answer.

Question 2

2 marks

Option 3 for meeting the water deficit in south-east England includes a desalination plant on an estuary, producing 40 million litres of fresh water a day.

Explain one disadvantage of using desalination.

Model answer

Desalination uses a lot of energy to force salty water through membranes to remove the salt. This means it has high running costs, which push up water bills, and if the electricity comes from fossil fuels it releases greenhouse gases that add to climate change.

Explanation

For 'explain one disadvantage' (2 marks), state the disadvantage and then develop it by explaining its consequence. Desalination's big advantage is that it does not depend on rainfall, but its energy use and brine discharge are the main arguments against it.

Mark scheme
  1. 1 mark

    It uses large amounts of energy (to force water through membranes / reverse osmosis)

    max 2; 1 mark for a disadvantage and 1 for its development. Only one disadvantage is credited.

  2. 1 mark

    so running costs are high, raising water bills / it releases greenhouse gases if the electricity comes from fossil fuels, adding to climate change

    development of the previous point

  3. 1 mark

    Salty waste water (brine) and chemicals are pumped back into the estuary

    Alternative disadvantage.

  4. 1 mark

    which can harm fish, shellfish and other wildlife in the estuary

    development of the previous point

  5. 1 mark

    It is very expensive to build

    Alternative disadvantage.

  6. 1 mark

    so the cost is passed on to customers through higher bills / money is not available for other schemes

    development of the previous point

Question 3

4 marks

Option 2 for Kestrel Water would release extra water from reservoirs in mid-Wales into the River Severn, take it out near Gloucester and pump about 100 million litres a day through a 200 km pipeline to south-east England. Figure 1 shows a model of a water transfer scheme.

Suggest why some people in Wales and along the River Severn might oppose Option 2.

A water transfer scheme. Heading: "A model of a water transfer scheme". A side view of a landscape from left to right. On the left are high hills with rain clouds and rain; water is stored in a valley among the hills, held back by a grey wall. On the right is flat lowland with tall city buildings under a bright Sun. A blue pipe runs from the foot of the wall across the land, through a hill in the middle (drawn dashed there), and on to the city; blue arrows point from left to right along it. Also shown: a small building with a pump symbol on the route. The letter A is printed in the heading over the hilly area on the left; the letter B is printed in the heading over the lowland area with the city on the right; the label "Reservoir" points to the water stored in the valley among the hills on the left; the label "Dam" points to the grey wall holding back the water in the valley; the label "Pipeline" points to the blue pipe running from the foot of the wall towards the city; the label "Pumping station" points to the small building with a pump symbol on the route; the label "Towns in the south-east" points to the tall buildings on the lowland on the right; the label "Direction of transfer" points to the blue arrow pointing right along the route, from the hills towards the city.

Model answer

Some people in Wales feel that water is a Welsh resource that is being taken to benefit people elsewhere. There is a long history of resentment: in the 1960s the village of Capel Celyn was flooded to create a reservoir for Liverpool. People may also worry that in a long drought Wales and the Severn area would run short of water themselves, yet still be expected to send water to the south-east. Along the River Severn, changing the flow by releasing and removing large amounts of water could harm salmon and other wildlife, and moving water between catchments can spread invasive species. Building a 200 km pipeline would also disrupt farmland and the countryside along the route.

Explanation

Level 2 answers suggest several different reasons (political, environmental, economic) and develop each one, explaining why it matters to people in the area that would supply the water rather than simply saying they would be against it.

Mark scheme
  1. 4 marks

    Levels of response (4 marks).
    Level 2 (3-4 marks): clear, developed suggestions of environmental, economic, social or political reasons for opposition in the area of surplus, with a clear link to the scheme; may refer to Figure 1.
    Level 1 (1-2 marks): basic suggestions, e.g. 'it is their water', with little development.
    0 marks: nothing worthy of credit.

    Indicative content (not a checklist; credit other valid points): the water is seen as a Welsh resource being taken to benefit people elsewhere; history of resentment, e.g. the village of Capel Celyn was flooded in the 1960s to create a reservoir supplying Liverpool; in a long drought Wales and the Severn area could also run short, but would still be expected to send water; changing river flows (low flows in dry summers, or unnaturally high releases) could harm salmon and other wildlife in the Severn; mixing water between rivers can spread invasive species and diseases; pumping uses a lot of energy, adding to greenhouse gas emissions; building the pipeline and pumping stations disrupts farmland and the countryside along the route; people may feel they should be paid fairly for the water, or that their own bills could rise; reservoirs may need to be kept fuller or enlarged, affecting landscapes in mid-Wales.

Question 4

9 marks

Option 3 for Kestrel Water, a water company in south-east England, combines saving water with a desalination plant: compulsory water meters in every home (saving about 20 Ml/d), repairing leaks to cut leakage from 20% to 12% of the water supplied (35 Ml/d), grey-water recycling in new homes (5 Ml/d) and a desalination plant on an estuary (40 Ml/d). It would provide about 100 Ml/d if all the targets are met, cost £950 million to build and about £18 million a year to run.

To what extent would Option 3 provide a sustainable water supply for south-east England?

Model answer

A sustainable water supply meets people's needs today without harming the environment or the ability of future generations to meet their needs, at a cost society can afford.

Much of Option 3 is very sustainable because it reduces the amount of water people need instead of taking more from the environment. About 60 of the 100 Ml/d would come from saving water. Fixing leaks to cut leakage from 20% to 12% would save 35 Ml/d of water that has already been treated and pumped, saving energy as well as water. Compulsory meters would reduce use by about 15% per person, because people pay for what they use, and they encourage people to value water in the long term. Grey-water recycling reuses water instead of wasting it. None of these measures floods a valley or takes water from another region, so rivers and chalk streams in the south-east would be under less pressure, and the savings would start soon, from 2027.

The desalination plant is less sustainable. It does have the great advantage of not depending on rainfall, so it would still work in a long drought or as summers become drier with climate change. However, it uses large amounts of energy, which means greenhouse gas emissions unless renewable electricity is used, and its salty waste could harm wildlife in the estuary.

There are also social and economic concerns. Running costs of about £18 million a year are high and could push up bills, and compulsory meters could hit large families and people on low incomes hardest, causing water poverty unless there are special tariffs. Finally, the 100 Ml/d is only achieved if all the targets are met, and leakage and behaviour targets are often missed.

Overall, Option 3 is sustainable to a large extent, because most of the water comes from using water more efficiently, which benefits the environment and future generations. Its sustainability is reduced by the energy use and brine of the desalination plant and its effect on poorer households, so it would be more sustainable if the plant used renewable energy and help were given to struggling families.

Explanation

Level 3 answers separate the parts of Option 3, recognising that demand management is much more sustainable than desalination, use the figures given, consider social, economic and environmental strands, and reach a clear 'to what extent' judgement. Noticing that the savings depend on targets being met shows good critical thinking.

Mark scheme
  1. 9 marks

    Levels of response (9 marks).
    Level 3 (7-9 marks): thorough assessment of the sustainability of the different parts of Option 3, weighing social, economic and environmental effects for present and future generations; detailed understanding of demand management and desalination; reaches a clear, substantiated judgement on the extent to which Option 3 is sustainable; makes effective use of the information given and accurate own knowledge.
    Level 2 (4-6 marks): clear discussion of some aspects of sustainability, which may be unbalanced (e.g. only the desalination plant); a judgement that is only partly supported; some use of the information.
    Level 1 (1-3 marks): basic points about Option 3 with little reference to sustainability; little use of the information; no clear judgement.
    0 marks: nothing worthy of credit.

    Indicative content (not a checklist; credit other valid points): sustainable means meeting present needs without harming future generations, balancing social, economic and environmental aims; demand management is highly sustainable: it uses less water rather than taking more from the environment, so less pressure on rivers and chalk streams; metering reduces use by about 15% and encourages people to value water; fixing leaks saves water that is already treated and pumped, saving energy and money; grey-water recycling reuses water; little land lost, no valley flooded, no transfer from another region; benefits start soon (from 2027), in stages; desalination does not depend on rainfall, so it is drought-proof and resilient to climate change; but desalination uses a lot of energy (carbon emissions unless renewable power is used) and discharges brine that harms estuary wildlife; running costs (£18 million a year) are high, which may raise bills; metering can push large or low-income families into water poverty - less socially sustainable; savings depend on people changing behaviour and on leakage targets actually being met, so 100 Ml/d is uncertain; grey-water systems mainly in new homes, so small savings; own knowledge, e.g. Thames Water's desalination plant in east London, UK leakage of about a fifth of water supplied; judgement, e.g. sustainable to a large extent because most of the water comes from saving rather than taking, but the desalination part and the impact on poorer households reduce its sustainability.

Ready to try the rest? Every answer you write is marked against the mark scheme, so you can see exactly where the marks are.

AI Tutor Hints first, answers after you try

Hi! Stuck? Ask me for a hint and I’ll help you work it out. Once you’ve checked your answer I can explain exactly where the marks are.